Preview buildContact details, contract number and branding are placeholders pending confirmation. 11 of 11 contacts outstanding.View clause coverage →

Compliance record

Clause coverage

Every mandatory requirement of the Statement of Work relating to this website and the ordering guide, mapped to where it is satisfied.

Attachment B assesses the contract holder’s website and ordering guide directly, under Category 2 — Information Distribution, with strikes. This page exists so compliance can be demonstrated rather than asserted.

Met6of 14 requirements
Partial7structure complete, content pending
Pending1awaiting contract holder input
Contacts confirmed0 / 11name, phone and email each required

SOW

12 requirements
ClauseRequirementWhere it is satisfiedState
A.5.1Maintain a public website publishing contract resources to the SEWP PMO, POCs and customersEntire site — public, no authentication on any required contentMet
A.5.1(1)A soft copy ordering guide suitable for downloading and printingOrdering guide — online and print/PDF
The CHUM confirms there is no defined template; content follows A.6
Met
A.5.1(2)Identification as a multi-award GWAC, with the Fair Opportunity Clause posted accuratelyHome banner and About the Contract — clause A.1.13 reproduced verbatim
Text is verbatim from the contract; awaiting Program Manager sign-off before go-live
Partial
A.5.1(3)(a)How to obtain a quote, with names, telephone numbers and email addresses of sales representativesHow to Order — procedure and sales contacts
Procedure complete; contact details awaiting confirmation
Partial
A.5.1(3)(b)Policy and procedure for installation, basic warranty, extended warranty, technical support, software support and other post-delivery issues, with support staff contactsSupport — all six named topics
All six topics present; procedure text is draft, contacts awaiting confirmation
Partial
A.5.1(3)(c)How to troubleshoot a problematic order, with support staff contactsSupport — separate order escalation path with three tiers
Escalation path defined; contacts awaiting confirmation
Partial
A.5.1(4)Links to related web resources such as corporate home pages and the SEWP home pageGlobal footer, present on every pageMet
A.5.1Compliance with Government Access Standards including Section 508Built to WCAG 2.2 AA — semantic markup, contrast, keyboard, focus
Built to standard from the first commit; formal audit, PDF tag validation and ACR/VPAT scheduled before go-live
Partial
A.5.2Program Manager's full contact information provided and maintainedHome and Support — program office block
CHUM requires individual contact details for PM and Deputy — no email aliases
Pending
A.5.3Customer support services: quotes, ordering guides, technical specifications, configuration analysisHow to Order — services offered free of chargeMet
A.6Ordering guide published, available before the first delivery order, updated within 10 business days of each modificationOrdering guide, with revision history
Guide published; the 10-business-day update process is an operational commitment for go-live
Partial
A.6(1)(2)Guide contains program support information and contractor/contract overviewOrdering guide — sections 1 to 5
Rendered from the same content as the website, so the two cannot diverge
Met

T&C

1 requirements
ClauseRequirementWhere it is satisfiedState
A.1.13Nothing marketed or offered before it is listed in the SEWP database of recordCatalog — pricing and ordering suppressed pending database-of-record confirmation
Catalog is presented as reference only; no prices published and no ordering path until items are confirmed listed
Partial

Attachment B

1 requirements
ClauseRequirementWhere it is satisfiedState
Category 2Website and ordering guide up to date and accurate; a link to the NASA SEWP website must be providedGlobal footer — NASA SEWP link on every page
Assessed under Program Performance with strikes; the SEWP link is explicitly named
Met

Outstanding before go-live

From the contract holder

  • Named contacts with individual telephone and email for all 11 roles
  • Confirmed contract number
  • Award date, to establish the A.5.1 deadline
  • Program Manager sign-off on the Fair Opportunity Clause text
  • Confirmation of operating policy behind the support procedures
  • Joint venture logo and brand palette

Scheduled work

  • Formal Section 508 audit, including manual screen-reader testing
  • Tagged-PDF validation of the ordering guide
  • Accessibility Conformance Report (VPAT) per T&C A.1.44
  • Catalog reconciliation against the SEWP Database of Record
  • Resolution of the 3 critical catalog import findings
  • Modification-tracking process for the 10-business-day guide update

Prepared for SOLAIYA LLLP · NASA SEWP VI Category C